Top
Otero County  Photo
  • Project Info

Otero County

  • Otero County Courthouse - Misc. Renovations
    • Misc. Renovations to the Existing Otero County Courthouse
    • Completion Date: 06/30/2020
  • Otero County Courthouse 2nd Floor Restroom Modifications
    • Renovating the second floor courthouse restrooms including new fixtures, plumbing, tile and lighting.
    • Sq Ft: 250
    • Completion Date: 12/30/2011
  • Otero County Courthouse Misc. Work
    • Misc. Work at Otero County: Convert open area to new Judges Chambers Remodel Existing Small Hearing Room Add Misc. Ductwork Remodel Managers Office Replace Shelving
    • Completion Date: 01/30/2015
  • Otero County Courthouse Remodel
    • The objective of this project was to remodel the first level of the exist jail to create 9,000 s.f. of new offices for the District Attorney. Execution of the work required demolition of the existing space to the structural elements. The new configuration houses private offices, conference rooms, waiting areas and open space for systems furniture. The existing structural columns within the area remained in place and were faced with gypsum wall board. Similarly, new walls were constructed using metal studs faced with sheet rock on one or both sides. Walls and structural columns in the common areas received wainscot on the lower portion and were trimmed with wood veneer strips. A conference room was constructed within the space using similar finishes. Semi-private work spaces were constructed by providing walls the same height as the wainscoting on the perimeter walls and were finished with wainscot with wood and wood veneer trim. Other finishes in these areas included surface mounted acoustical ceiling tiles and light fixtures. Carpeting was used throughout the private and public areas. A kitchen/break room was also created using a gypsum wallboard system, acoustical ceiling and vinyl composition tile flooring. Other work in the kitchen required installation of a sink, cabinets and countertops and required plumbing, ventilation and electrical features Separate men’s and women’s ADA compliant restrooms were constructed using hard surface walls and ceramic tile floors with toilet partitions and plumbing fixtures. Access to the offices was provided from the exterior through a newly created storefront entrance. This required demolition of an existing sally port that provided controlled access from the jail to the parking lot. ADA ramps were also provided. Repairs at the new opening also included stucco repairs and masonry infill. Building systems included: a boiler and chiller for the HVAC system, plumbing, communications and electrical.
    • Sq Ft: 9,360
    • Completion Date: 09/08/2009
  • Otero County Detention Center Additions and Repairs
    • The construction of approximately 36,000 SF of additions and the renovation of approximately 10,000 SF of space at the existing Otero County Detention Center and other Work indicated in the Contract Documents. The additions will be constructed primarily of concrete masonry units (CMU) and precast concrete roof members. Project Includes the construction of additions to the Booking Area, Administration Area, Laundry, and Recreation Yards north of the existing housing unit, and construction of a new Mechanical/Electrical Building plus related site work. The renovation of the existing Booking Area, Administration Area, Laundry, and associated spaces. The replacement of all interior lighting fixtures, main plumbing lines, and security systems. The construction of additions to the Medical Area, Kitchen, and Receiving Area. The renovation of the existing Medical Area and Kitchen. Perimeter security fencing and gates are also included in the Project
    • Sq Ft: 46,000
  • Otero County Dispatch Center
    • Renovation and Interior Build-out to an existing Pre-Engineered Metal Building for the new 911 Call Center in Otero County. Project included light gauge framing, sound board, drywall, insulation, painting, stucco, carpet, ceramic tile, electrical, HVAC, and Plumbing.
    • Sq Ft: 2,000
    • Completion Date: 01/20/2011
  • Otero County Fairgrounds New Exhibit Building
    • This project involved construction of new 19,200 s.f. clear-span pre-engineered metal building. Work requires demolition of existing structures, installation of a concrete foundation with helical piers. The building houses exhibit areas, a kitchen and restrooms. The project required a new water main extension, mechanical, electrical and plumbing service and systems.
    • Sq Ft: 19,200
    • Completion Date: 07/30/2009
  • Otero County La Luz Transfer Station Facility - Phase 2
    • This project consists of upgrades to an existing solid waste convenience center operated by Otero County in the community of La Luz which includes the construction of the La Luz Landfill Transfer Station building, required utility work such as but not limited to mechanical and electrical components for proposed building, construction of a new access road and drive pad that ties into existing access roads, retaining wall and other associated appurtenances and general site work. Work of the Project includes construction of a new Transfer Station, including a public vehicle drive-in bay, office and storage space, and a lower trash truck pull-through bay for hauling solid waste.
    • Sq Ft: 5600
    • Completion Date: 01/18/2019
  • Otero County La Luz Transfer Station Facility - Tenant Improvement
    • Interior Tenant Improvement to teh Trasfer Station We Built in 2018. Project Includes Framing, Insulation, Windoes/Doors, Drywall, Cove Base, FRP, Toilet Accessories, and MEP.
    • Sq Ft: 936
    • Completion Date: 12/04/2019
  • Otero County Office Complex
    • New Design/Build Renovation project to an existing two-story building. The existing building had a basement that we gutted and revamped. The project included a new elevator, stucco, cultured stone, light gauge framing, remove/replace roofing, drywall, painting, plumbing, HVAC, and Electrical.
    • Sq Ft: 11,928
    • Completion Date: 05/28/2010
  • Otero County Recycling Hub Facility
    • Construct an owner-furnished 3000 square foot metal building for the Otero County Recycling Facility. The project included, site-work, concrete, steel erection and electrical.
    • Sq Ft: 3000
    • Completion Date: 11/07/2011
  • Otero County Road Department Maintenance Shop Building
    • New Pre-Engineeered Metal Building 16,000 Square Foot Heavy Truck Maintenance Shop and two office spaces to include concrete foundations, interior finishes, plumbing, HVAC, and electrical systems.
    • Sq Ft: 16,000
    • Completion Date: 09/27/2006
  • Otero County Zia Therapy Center
    • Sq Ft: 7,267
    • Completion Date: 08/22/1997