Top
Ruidoso  Photo
  • Project Info

Ruidoso

  • Ruidoso 1490 AM KRUI - The Mountain Radio Station
    • Convert an Existing Empty Space into the New Radio Station for the Village of Ruidoso. Work Included 3-coat Stucco for exterior surfaces, interior finishes, plumbing, HVAC, and Electrical.
    • Sq Ft: 621
    • Completion Date: 05/20/2021
  • Ruidoso Community Center - Exterior Work
    • White Sands Construction, Inc. was selected by the Village of Ruidoso to perform the following work: Prep, Patch, & Paint Stucco & Wood Surfaces to Include All Exterior Walls, Soffits, & Fascia Elastomeric Paint to Be Utilized at All Exterior Stucco Surfaces Replace Rotted Fascia/Soffit & Trim Beyond Repair Prep & Paint Existing Non-Prefinished Doors/Windows & Frames (Outside Faces Only) Remove & Reinstall Existing Building Letters & Numbers for Proper Paint 3”x4” Gutters and Downspouts Around Perimeter of The Ruidoso Community Center as Applicable - see attached schematic
    • Completion Date: 10/01/2020
  • Ruidoso Community Center - Interior Ceiling & Lighting Upgrades
    • White Sands Construction, Inc. was selected by the Village of Ruidoso to perform the following work: • Remove & Dispose Existing 2’x4’ Acoustical Ceiling Pads Only • Remove & Dispose Existing Batt Insulation Above Existing Acoustical Ceiling • New 2’x4’ Acoustical Ceiling Pads Only (Kitchen Areas & Kitchen Storage Area to Get Vinyl Faced Tiles) • New R-30 Batt Insulation Above Existing Acoustical Ceiling Tied to Deck • Remove, Clean, & Paint Existing Supply & Return Air Diffusers • Remove & Dispose of 4 Existing Evaporative Cooler Grilles and Duct • Remove & Replace 17 Existing Bulbs with LED Bulbs in Standard and Track Lighting Fixtures to Remain • Remove & Replace Bulbs Only with LED at all 1’x4’ Surface Mounted Fixtures & 2’x4’ Lay-in Fixtures • Install 2 New Surface Mounted 1’x4’ LED Fixtures to Replace 3 Track Lights at Street Entrance
    • Completion Date: 04/19/2022
  • Ruidoso Convention Center - Exterior Wood Beam Repairs
    • Repair Exterior Wood Entrance Decorative Beams that were damaged by a Large Vehicle
    • Completion Date: 08/30/2019
  • Ruidoso Convention Center - Restroom Renovations
    • The Restroom are being remodeled due to outdated Finishes, Toilet Partitions, and Plumbing Fixtures . The remodel will consist of installing up to date plumbing fixtures for better water conservation.
    • Sq Ft: 795
    • Completion Date: 01/09/2020
  • Ruidoso Downs Miller Waldrop Furniture Renovations
    • Complete Exteiror Facade Renovation to include New Stucco, Storefronts, & Awnings. Renovate to Mattress Area to include New Flooring, Ceiings, Framing, Painting, & Electrical Sq Ft: 23460
    • Completion Date: 05/23/2019
  • Ruidoso ENMU Flood Damage Repairs & Replacements
    • The scope of this project involved repairs to an existing that was heavily damaged by heavy rains. Execution required demolition of 20’ damaged walls on the side of the mountain and construction of 100’ long wall with heights ranging from 15’ to 25’. Other work included encapsulation of an underground spring and diversion of water. A new stucco wall was constructed on the south side of building.
    • Sq Ft: 36,910
    • Completion Date: 03/11/2008
  • Ruidoso Horton Complex Building & Site Improvements
    • Interior, Exterior, & Site Renovations to the Horton Complex in Ruidoso, NM: Upon completion, the Horton Complex building will house several Village Departments (Services) which includes the secondary IT Main Frame, Municipal Court, and Consolidated Dispatch.
    • Sq Ft: 8843
  • Ruidoso Midtown Restrooms
    • New Midtown Restrooms for the Village of Ruidoso to consist of: Earthwork Demolition Concrete Masonry Wood Trusses Metal Roofing Insulation Painting MEP
    • Sq Ft: 990
    • Completion Date: 09/09/2021
  • Ruidoso Pedestrian Bridge at Alto Lake
    • Furnish & Install Materials for New Composite Framed Pedestrian Bridge located at Alto Lake Bridge had helical pier foundations and is 55' long x 5' wide
    • Completion Date: 04/27/2022
  • Ruidoso Public Library - Stairwell Closing & Egress Changes
    • Close off Existing Stairwell in Ruidoso Public Library for Childrens Safety and Provide Egress Improvements
    • Completion Date: 06/19/2020
  • Ruidoso Solid Waste - New Storage Building
    • New Pre-Engineered Metal Building Addition on Existing Concrete Foundations with 20’ Eave Heights.
    • Sq Ft: 2,080
    • Completion Date: 10/01/2020
  • Ruidoso Utility Building
    • Construct a single story 7,500 square feet pre-engineered building and site improvements. The building will include service bays, open office, parts storage, toilets, and a shower. The interior finishes will be gypsum board walls, vinyl composition tile floors and acoustical panel ceilings. The building services will be ground mounted and ducted to the individual spaces.
    • Sq Ft: 7,500
  • Ruidoso Village Hall - Renovations & Additions
    • White Sands Construction, Inc. was selected by the Village of Ruidoso on a design/build contract to perform the following work: Supervision, Trash, Temp. Fence/Partitions/Floor Protection, Porta-Potties, CID Permit, & Final Cleaning Termite Control for New Slabs/Foundations Re-Seeding Disturbed Areas - Basic Seed to be Utilized Earthwork & Sitework per Plans Exterior & Interior Demolition per Plans Helical Piers per Plans Site & Building Concrete per Plans Masonry Stem Walls & Stone Veneer per Plans New Stone Veneer Will Match existing as Close as Possible Exterior and Interior Wood Framing per Plans Casework with Solid Surface Counter at Lobby/Check-in 117 Thermal Insulation & Sealants per Plans Metal R-Panel Roofing per Plans to Match Existing as Close as Possible Doors, Frames, & Hardware per Plans Windows & Storefronts per Plans New Windows will Match existing as Close as Possible Finishes to Include Drywall, Acoustical Ceilings, Flooring per Plans, & Painting New Broadloom Carpet Will Match existing as Close as Possible Patch/Repair, & Paint Drywall in Areas of Renovation Remove & Replace Ceilings in Areas of Renovation Prep & Paint Existing HM Frames in Areas of Renovation 3-Coat Portland Cement Plaster per Elevations Furnish & Install Toilet Accessories at Two New Restrooms, Room Panel Signs, and Two New Fire Extinguishers & Cabinets Plumbing per Plans to Include Reusing Existing Water Heater HVAC per Plans to Include New HVAC per plans at Existing and Re-working/Reconfiguring Existing HVAC Equipment Electrical and Low Voltage per Plans
    • Sq Ft: 8916
    • Completion Date: 11/18/2021
  • Ruidoso Wingfield Exterior Renovations - Phase 1
    • Exterior Renovations to the Historic Wingfield House in Ruidoso, NM consists of: Stucco Painting Demolition/Earthwork Window Replacement Sealing Existing Chimney
    • Completion Date: 01/27/2022
  • Ruidoso Wood Stairs at Alto & Grindstone Lakes
    • Furnish & Install Materials for New Wood Framed Stairs located at Alto & Grindstone Lakes Prep & Seal/Stain Both Sets of Stairs