Protect Existing Flooring to Remain
Remove & Replace 4 Existing Partitions with 3 New Powder-Coated Overhead Braced Metal Partitions in Women’s Restroom - (We are removing one toilet to Make an ADA Stall)
Remove & Replace 2 Existing Partitions with 1 New Powder-Coated Overhead Braced Metal Partitions in Men’s Restroom - (We are removing one toilet to Make an ADA Stall)
Remove & Reinstall all Existing Toilet Accessories and Grab Bars
Add 18” Grab Bar in new ADA Stalls (Quantity 2)
Add 36” Grab Bar in new ADA Stalls (Quantity 2)
Remove One Existing Wall Hung Toilet in Each Restroom to Provide Both Women’s & Men’s Restroom with 1 ADA Stall. Install Clean-out Cover on Existing Wall Hung Toilet that will be removed - ADA Toilets Will have to Be Raised to Meet ADA Requirements (We will Provide a Stainless-Steel Flashing at Wall to Cover CMU Damage from Relocating Toilet)
Replace Four Flush Valves for Existing Toilets
Caulk All Old Holes from Old Toilet Partitions/Removed Wall Hung Toilets
Completion Date: 04/11/2022
Owner: Town of Silver City
Location: Silver City, NM