Close
Skip to Content
High Contrast
Increase Text Size
Clear All
575-437-7816
575-437-7816
Home
About
Awards
Community Outreach
Our Team
Chevy Teague
Catlin Curry
Zeke Greer
David Malett
David Wootten
Debbie Lucero
Donald Yee
Ethan Schulz
Eugene Varbel
John Ballin
John Henderson
Joyce Tilbury
Kimber Parsons
Levi Williamson
Marc Davis
McChristie Curry
Mike Ford
Mike Watters
Norman Drews
Raul Ruiz
Ray Fletcher
Robert Amos
Steve Malett
Construction Services
Commercial Construction
Construction Management
Foundation Repair
Private Contractor
Testimonials
Reviews
Contact Us
575-437-7816
Top
Projects
Schools
Project Info
Schools
Las Cruces Public Schools - Jornada Elementary Additions & Remodeling
Sq Ft: 10,578
Completion Date: 10/05/2011
Las Cruces Public Schools - Vista Middle School Music Wing Addition and HVAC Replacement
Constructed a new music wing addition and replaced the HVAC at Vista Middle School in Las Cruces, NM.
Sq Ft: 7,658
Completion Date: 09/30/2005
Mesilla Valley Youth Foundation - Court Junior High School - Phase 1 Renovations
Sq Ft: 22,742
Santa Fe Public Schools - Aspen Community K-8 School Phase 2 Addition & Renovations
The work of Phase 2 will be to construct the classrooms and labs for this 6, 7, & 8th Grade Academy as well as finish necessary improvements not constructed due to time constraints in the Phase 1 build. This will be a free-standing 2-story building in a Master Plan location for eventual build-out of Student Commons, new cafeteria, public gymnasium restrooms and new kitchen, connecting the Academy to the interior of the existing Aspen School. The building has an exterior staircase for emergency exit, and an interior staircase for travel between the floors. An elevator is also located in the building. Individual Teacher restrooms are located on each floor. A Teacher Workroom / Collaboration space is located on the second floor. Space for electrical rooms, IT rooms, and general storage have been provided. All teaching spaces will have SMART Boards and sliding white boards. Each Floor will have 5 classrooms and 2 lab spaces. A total of 4 individual dedicated Project Rooms are located on both floors. These Project Rooms are K-8 features and are intended as group project rooms, individual research rooms, testing, one-one tutoring etc and are not intended for office space nor storage. The Project Rooms are located on the central spine, accessible to all Academy Teachers and have windows for supervision from corridor and classrooms. The lab spaces that could have more frequent crossover with the K-5 population have been located on the ground floor. - One of the ground floor classrooms has been identified programmed and will be stubbed out for electrical & plumbing, as a continuation of the Special Education Program which is highlighted as part of the Phase 1 construction already completed. A Middle School room will allow those students enrolled in the Special Education to continue their education within the Aspen Community growing into the Academy setting. During the Phase 2 construction, accommodations for the Special Education Office and classroom restroom will be accomplished. - All included labs have approximate. 1200 square feet. The 1st floor will have 2 lab spaces; The Art Lab is located with large east facing windows for natural studio lighting. The Science Lab will have a fume hood located on the wall and the Teacher demonstration desk will have an eyewash station. A separate storage and Teacher Prep area are located next to the Science Lab with appropriate cabinetry for chemicals, equipment and a sink. This room has a window into the classroom for supervision. - The 2nd floor has a Computer/Technology Lab with data/power located on walls. A separate locked storage room for equipment, keyboards, cameras, cables ect is located adjacent to this lab. The fourth lab which is located on the 2nd story as well is a Flex Lab for electives. The current Aspen Community Magnet School is operating 3 Kindergarten spaces within the school. Two of these current Kindergarten spaces are slated to become the STEM Initiative classrooms. - Renovation of 4 existing regular classrooms will be necessary to construct to State Adequacy, the 3 Kindergartens. A small addition will be constructed on the east end of the building for Kindergarten 3, otherwise all work is renovation within current walls. - Installation of individual student restrooms, sinks in each classroom, individual classroom doors to playground, a new janitorial closet, exterior exit, and covered paved area are all features of this work. The new classrooms will have an average clear floor area of 1,150 S.F. not including individual Kindergarten storage rooms and restrooms. Completion of the new entry to the school is also part of this work. The covered entrance and esthetic features will be constructed. - This covered portal, natural light monitor and site path lighting, is a part of the project. Read about the project in the Santa Fe New Mexican.
Sq Ft: 40,000+
Completion Date: 08/14/2012
Santa Rosa Middle School Phase 1
The scope of work for this project includes construction of a new 20,000 square foot single story middle school. Construction including twelve classrooms, a media center and a science laboratory complete with science grade casework and epoxy resin countertops. Elements of work included: site preparation including over excavation and select backfill and compaction; approximately one mile of new underground sewer and water service lines extended to the site; two 12,500 gallon LP storage tanks and accessories; over 4,000 feet of chain link fencing encompassing the property; cast-in-place concrete foundations and slab-on-grade; structural steel and twenty-two foot high stucco over masonry exterior walls; steel joists and beams; insulation, sealants and standing seam metal roof system with skylights; fifty new aluminum framed arched windows; hollow metal frames and hollow metal and oak wood doors and hardware; roll-up grilles; light-gage steel framing; gypsum wallboard; painting; acoustical suspended ceilings; new ceramic tile walls and floors; carpet and vinyl composition flooring; and, complete mechanical and electrical systems including boilers, hydronics system, HVAC system and control, power, lighting, communications and alarm systems.
Sq Ft: 30,404
Completion Date: 07/17/2004
Truth or Consequences Elementary School - Roofing, HVAC & Misc. Renovations
The scope of this project involved roofing repairs and replacement of a single-ply TPO roof. Execution required temporary removal of HVAC systems from the roof top requiring use of temporary cooling systems.
Completion Date: 03/26/2008
Alamogordo German School Storage Addition
Addition of a Storage Room approx. 1,000 sq. ft. including standing seam roof, joists, interior/exterior wall, electrically operated coiling doors & stucco fadade. Finished to match existing structure.
Sq Ft: 1,040
Completion Date: 08/25/2004
CES (Cooperative Educational Services) Gordian/R.S. Means JOC Contracts
Multiple Contracts with CES using Gordian Pricing.
Cobre Schools - Renovations and Additions
Sq Ft: 7,603
Clovis Municipal Schools - Park View Elementary Structural Improvements
Structural Improvements to Parkview Elementary in Clovis, NM to include Helical Piers, Concrete, and Windows.
Completion Date: 05/17/2007
Clovis Municipal Schools - Renovations to Gattis Junior High School
Renovations to Gattis Junior High School to include: Close-in existing windows with stud walls and stucco, New acoustical ceilings and electrcial upgrades, New Rooftop HVAC Units, and re-roof.
Sq Ft: 9,100
Completion Date: 11/29/2001
Corona Public Schools - Welding Shop
This project involved construction of an addition to an existing welding shop for the district. Work requires procurement and erection of a 1,200 s.f. pre-engineered metal building requiring site preparation and installation of a foundation tying in to the one for the existing structure. Other trades include: finished and painted drywall on the metal studs at exterior walls, sealed concrete, insulation between the exterior wall and sheet rock and a specialized exhaust system.
Sq Ft: 1,200
Completion Date: 10/20/2009
Dexter Classroom & Media Center Additions
Hobbs High School
Hobbs High School 4.1: 300 & 600 Classroom Wing Alterations "Two Classroom Wings: Replace all interior finishes, lighting, power and special systems. Replace HVAC units in the 300 Wing. Re-Roof the 300 Wing. 600 Wing Addition will be slab on grade, masonry bearing walls, steel joist & deck, BUR, HM frames, wood doors, aluminum storefront entrance, gypsum bd partitions, VCT, acoustical ceiling system, paint, HVAC, plumbing, lighting, power and data. Site work includes concrete sidewalk
Sq Ft: 64867
Completion Date: 09/06/2013