Renovations and Additions to the following elementary schools: Pate Elementary Puckett Elementary Riverside Elementary E.M. Smith Elementary
Remove Existing Asphalt & Concrete Main Walking Path Install new Asphalt and Concrete Main Walking Path at Alameda Zoo
Remove Existing Waterfowl Deck & Pergola - Install new Treated Waterfowl Wood Deck and Redwood Railing over the Waterfgowl Pond ...
Convert an Existing Empty Shell Space into a new Orthodontics Clinic in Alamogordo, NM.
Alert Cellular Build-out in an existing shell in the Wal-Mart Supercenter Parking Lot.
Misc. Renovations to an Existing Arby's Restaurant.
Design/Build project that consisted of renovating a historic building and turning it into a full service tanning and hair salon along ...
Renovation for New Clinique Boutique
New 9,279 Square Foot Health Clinic. This project involved construction of a new medical/dental clinic. The facility was constructed on a ...
Best Dollar Build-out in an existing shell in the Wal-Mart Supercenter Parking Lot.
Turned an existing convenience store into a new sandwich deli.
New 6500 square foot Buffalo Wild Wings Restaurant.
New Burger King located in Alamogordo. Completly demo existing structure and site and build new.
Construction Manager for a new BBQ Restaurant in Alamogordo, NM. Converted a Baskin Robbins into a new BBQ restaurant with all ...
Design/Build a 2430 square foot Carls Jr. Restaurant
Brand New Building
Constructed a 21,000 + square foot building using light gauge framing and structural steel. This project included city offices, municipal ...
White Sands Construction was selected by the City of Alamogordo for this project in which the bathroom fixtures and finishes ...
White Sands Construction was selected by the City of Alamogordo for this project as a result of the company’s extensive ...
The City of Alamogordo, New Mexico has selected White Sands Construction, Inc. to construct the new family entertainment center. The ...
New pool, basketball courts, and offices for the City of Alamogordo. The pool can be used year-round where the roof can ...
Reset CMU Loose Caps, Waterproof and Float CMU Wall. Finish Wall with Color Coat of Stucco and Paint all Guardrailing ...
The Work will consist of upgrades to interior finishes of the Family Recreation Center Locker Rooms, removal and replacement of ...
Reconfigure entry way to accommodate storefront entries with an ADA operator.
Addition of a Storage Room approx. 1,000 sq. ft. including standing seam roof, joists, interior/exterior wall, electrically operated coiling doors ...
Remodel 72 Room Hotel to meet new Prototype Standards including all Public Areas
Remodel 80 Room Hotel to meet new Prototype Standards including all Public Areas
Demolition and Installation of new asphalt/concrete sidewalks and parking areas.
The work will consist of installing vinyl fencing to create 70 (seventy) individual yards in the Alta Vista Housing Complex within ...
The scope of work included interior and exterior remodel of approximately 150 housing units. Project elements of work included: xeriscaped ...
New IHOP Restaurant built in 87 Days, which was the fastest ever built in the country! Project consisted of wood ...
Breakroom Expansion for PreCheck, Inc.
Renovation of 11 School kitchens over the summer to meet code - completed in 80 days. One of the kitchens ...
Alamogordo Readiness Center – 9,662 SF addition to the existing 14,750 sq. ft. armory building, including all site work, located ...
Remove Existing Non-electric Partition Walls and Install Electric Partition Walls and acoustic sound panels.
New multi-level 18,500 Square Foot Suburban Extended Stay Hotel. The construction is wood framing complete with a pool, office complex, and ...
New Taco Bell Restaurant located in Alamogordo, NM built to new prototype standards.
Remodel to the existing Taco Bell in Alamogordo, NM. This remodel will upgrade the building to the new prototype.
Interior & Exterior Remodel of an Existing Space to a New Domino's in Albuquerque, NM. This remodel will upgrade the ...
New AT&T Retail Building that will accomodate a new AT&T Building. Project consists of foundations, asphalt, landscaping, brick veneer, wood/metal ...
Remodel to the existing Domino's in Artesia, NM. This remodel will upgrade the building to the new prototype.
Work of this contract is for general construction of Artesia Health Resources Additions, a single story building addition to the ...
New IHOP Restaurant. Project consists of wood framing/trusses, standing seam and TPO roofing, EIFS, awnings, storefronts and glazing, gypsum board, ...
The work of Phase 2 will be to construct the classrooms and labs for this 6, 7, & 8th Grade ...
Brand New Domino's in Belen, NM located in New Retail Complex. This building will be the new prototype.
New Open Space Retail Center that will accommodate retail spaces. Project consists of foundations, asphalt, landscaping, wood framing, Steel, TPO ...
Multiple Contracts with CES using Gordian Pricing.
The scope of this project included construction of a new 20,000 square foot, two-story masonry over structural steel Cultural Museum ...
The scope of work for this project includes construction of the Regional Headquarters Building for the Immigration and Naturalization Service. ...
New Burger King Restaurant located in Carlsbad, New Mexico.
New ground-up 13,225 square foot CVS pharmacy store. Project includes major demolition of existing structures, asbestos aqbatement, utilities, building and ...
Brand New Domino's in Carlsbad, NM located in New Retail Complex. This building will be the new prototype.
New IHOP Restaurant built in 96 Days, the second fastest built in the country! Project consisted of wood framing/trusses, standing ...
Renovation consisting of 45,564 square feet (+/-) of the following tenant improvements: Ross - 19,480 square feet, Famous Footwear - 5,129 ...
New Open Space Retail Center that will accomodate retail spaces. Project consists of foundations, asphalt, landscaping, wood framing, Steel, TPO ...
After originaly building this community center in the 1990's, White Sands has been selected to perform renovations on this complex ...
Interior remodel of a Fire Station
Interior Remodel of Fire Station #2
This project involved development of the site for installation of a modular building including excavation, backfill, compaction and shaping of ...
Work of this contract is for general construction of the Chaparral Community Center, a single story building for the County ...
New 1200 square foot addition for new offices and a 560 square foot breakroom remodel.
New Outdoor Pavillion/Pergola for the City of Alamogordo
The Clovis Civic Center is a 30,000sf facility with a 9,000sf ballroom and several large meeting rooms. A sculpture garden/entry ...
Remodel to the existing Domino's in Clovis, NM. This remodel will upgrade the building to the new prototype.
The scope of this project involved design and construction of a 45’ x 100’ pre-engineered metal building to be used ...
This project involved construction of an addition to an existing welding shop for the district. Work requires procurement and erection ...
Project consisted of renovating the interior and exterior of the Deming Depot. Exterior work included replacing woodwork that was unsalvageable, ...
White Sands completed construction of the Pit Park recreational area. Improvements included the installation of several thousand feet of walkway ...
Renovate existing Chevy dealership to bring up to GM standards. New 1600 square foot addition and new Chevy entry element. Remove/Replace acoustic ...
New 38,875 Square Foot Toyota dealership. This project will consist of a new pre-engineered metal building w/ standing seam roof ...
The new 911 center is responsible for handling all emergency communications and dispatch for Doña Ana County. A spacious dispatch room ...
The city has authorized a contract for the construction of a $11 million East Mesa Public Safety Complex and has ...
Remodel Existing Treasurers Office in Eddy County with New Transaction Counters and Glass/Glazing.
New Carl's Jr. Restaurant located in El Paso, TX built to new prototype standards.
New Carl's Jr. Restaurant located in El Paso, TX built to new prototype standards.
New Taco Bell Restaurant located in El Paso, TX built to new prototype standards.
New Taco Bell Restaurant located in El Paso, TX built to new prototype standards.
New Taco Bell Restaurant located in El Paso, TX built to new prototype standards.
Convert an Existing Empty Shell Space into a new Verizon Wireless in El Paso, TX.
Convert an Existing Empty Shell Space into a new Encompass Home Health Office in Carlsbad, NM.
The scope of this project involved repairs to an existing that was heavily damaged by heavy rains. Execution required demolition ...
This project involved construction of a new credit union housing a lobby, teller stations including drive-through, private and open offices ...
New Burger King Restaurant located in Farmington, New Mexico.
New 6,000 square foot Pre-Engineered Metal Building to house a Beef Jerky Manufacturing Facility in Hagerman, NM. The project consisted ...
Small workout room additions to 5 firestations for the City of Las Cruces. Construction included 6" metal stud walls with gypsum ...
Design/Build Flickinger Patron's Hall and Western Heritage Museum Building - Historic Renovation
White Sands Construction was contracted to construct the 3,500-grave veteran cemetery. The cemetery is located on 13.5 acres one-half mile ...
White Sands Construction was contracted to construct a new cemetery with precast crypts and cremains areas, a new single-story, approx. ...
Construct a new 3,500 S.F. pre-engineered metal building with an 18’ eave height. A part of the building will be ...
Additions and Renovations to the Child Development Center at Holloman Air Force Base, NM.
Renovation to a Loading Dock at Holloman Air Force Base, NM
Convert an Existing Empty Shell Space into a new Domino's at Holloman Air Force Base, NM. This conversion upgraded the ...
Existing west end of Building 1173 was damaged by the wind due to structural issues. White Sands Construction plans on ...
Construct GAF Munitions Maintenance Complex - Contract # DAC47-99-C-0001
Construct a 3,128 square foot Mason and Structural Steel Structure to Holloman's Design Standards.
White Sands Construction had two IDIQ Contracts with Holloman Air Force Base, NM. Most of the projects were Design/Build.
New AAFES Mini-Mall at Holloman Air Force base that contains a Popeyes Chicken, Uniform Store, and Convenience Store. Contract # ...
Replace all main sewer lines for Holloman Housing - Phase 3 - Contract # F29651-02-C-0007
Saw-cut and remove a complete 20’ tall partition wall consisting of C.M.U., metal studs, and drywall in order to allow ...
Replace Kitchen Cabinets at HAFB Gemini Housing. Contract # F29605-00-D-0002
Multiple Design/Build Projects at Holloman Air Force Base, NM. Contract # F29651-01-D-0004
The scope of this delivery order involves design and construction of a 40’ x 50’ addition to the Network Control ...
Renovation to Building 302 at Holloman Air Force Base. The project included demolition, Mold abatement, batt insulation, drywall, painting, light ...
This contract that involved design and construction of a 29’4” x 440’0” CMU addition to the southeast corner of an ...
The scope of this project involved demolition of a portion of the existing building and complete renovation of the remainder ...
This contract that involved design and construction activities related to the replacement of an existing roof. Work required demolition of ...
This contract that involved design and construction of alterations to Building 868 to accommodate a new tenant, the F-22 Aircraft ...
This design/build White Sands Construction, Inc. project included Design and construction of the FY12 Academic Training Facility (ATF) and the ...
Phase 3 Additions to Hagerman High School.
Two Classroom Wings: Replace all interior finishes, lighting, power and special systems. Replace HVAC units in the 300 Wing. Re-Roof ...
Remodel to the existing Taco Bell in Hobbs, NM. This remodel will upgrade the building to the new prototype.
New 6,000 square foot Pre-Engineered Metal Building to include Office Spaces and a Shop Area. Project Included Concrete Slab on Grade, ...
White sands Construction has been awarded a Job Order Contract to perform renovation, repair, minor new construction and remodel work ...
The scope of this project involved construction of the Joseph Skeen Visitor Center at Bitter Lake National Wildlife Refuge location ...
This project consists of upgrades to an existing solid waste convenience center operated by Otero County in the community of ...
The new volunteer fire station of approximately 8,800 SF involves wood and CMU with stucco exterior and single-ply membrane and ...
Convert an Existing Empty Shell Space into a new Aaron's in Las Cruces, NM.
New Burger King Restaurant located in Las Cruces, New Mexico.
Remove & Replace existing roof to include all roof-top equuipment. Remove & Replace restaurant tile, bathroom partitions, and kitchen ceilings. Re-paint exterior ...
New KidsKare P.C. Family Dentistry TI
White Sands Construction, Inc has been selected as the Construction Manager for the construction of the proposed devolpment for the ...
New 7,403 square foot doctors office which includes a clinic and a family care urgent centers in one complex. The clinic ...
Convert an Existing Law Office into a new Healthcare Facility. Complete Remodel included new plumbing, electrical, framing, roofing, and finishes. ...
White Sands Construction provided a LEED-certified tenant build-out for the global coffee corporation, Starbucks, in their newest Las Cruces, NM ...
Sate Farm Office Tenant Improvement
Convert an Existing Empty Shell Space into a new T-Mobile in Las Cruces, NM.
New Taco Bell Restaurant located in Las Cruces, NM built to new prototype standards.
Convert an Existing Empty Shell Space into a new Verizon Wireless in Las Cruces, NM.
Remodel an existing Payless Shoe Store into a New Domino's Pizza Theater in Los Lunas, NM.
New Taco Bell Restaurant located in Lovington, NM built to new prototype standards.
Historical renovations including interior and exterior wood repair and replacement of doors, frames and trim, toilet room remodel to meet ...
White Sands Construction, Inc. served as the prime contractor for this project that involved design and construction of an American ...
New 300 square foot addition to the existing building. New roofing over existing metal roof. New stucco and cultured stone.
· West Door – Remove and Replace Door and Hardware, Prep, Fix and Repaint Frame, Paint New Hollow Metal Door · ...
New IHOP Restaurant. Project consisted of wood framing/trusses, standing seam and single ply roofing, 3-coat stucco with foam pop-outs, awnings, ...
Constructed a 11,066 sq. ft. Health & Fitness Facility on an existing parking site located in the 100 area. The ...
Tenant Improvement to Navajo Refining.
Construction of approximately 6,065 square foot standalone Sally Port building outside the front entrance of the existing Forensic Building. A ...
The scope of Work includes the construction of approximately 18,348 square foot State Police Building and a 2,847 square feet ...
Multi-Floor Mechanical Renovation including removing/replacing ceilings, HVAC Equipment, Plumbing, and Electrical. Construct a new HVAC cat-walk as well. Here is the ...
New construction (approximately 6,004 s.f.) to include two early childhood classrooms and one multipurpose educational room. The building will also ...
Work of this Contract covers selective demolition and plumbing, mechanical, electrical, and other interior renovations of Presidents' Hall on the ...
The scope of the remodel includes the basement, first, second, and third levels, and focuses on converting former science laboratories ...
Soleil West designed the remodel of the New Mexico Highlands University Natatorium. The remodel totals 12,605 square feet, and was ...
Project consisted of painting the existing joist and deck with moisture resistant paint; adding a dehumidifier; repairing the pool plumbing, ...
New LEED Silver project that consists of offices, classrooms, art room, commons, and meditation room. This includes all site utilities, ...
Concrete foundation, wood framing, glue-lam super structure, tile roof. Exterior to have stucco and glass block windows. Interior finishes include ...
Renovations to existing Biology Classroom, renovations to include new mill-work,fume hood installation, reconfiguration of mechanical, plumbing throughout space. Renovations to existing ...
White Sands Construction, Inc. served as the prime contractor for this project that involved construction of a 16,716 s.f. three-story ...
New LEED Gold project that consists of remodeling two existing computer labs to be remodeled into one and a 6,815 ...
Renovating the second floor courthouse restrooms including new fixtures, plumbing, tile and lighting.
Misc. Work at Otero County: Convert open area to new Judges Chambers Remodel Existing Small Hearing Room Add Misc. Ductwork Remodel Managers Office Replace Shelving ...
The objective of this project was to remodel the first level of the exist jail to create 9,000 s.f. of ...
Renovation and Interior Build-out to an existing Pre-Engineered Metal Building for the new 911 Call Center in Otero County. Project ...
This project involved construction of new 19,200 s.f. clear-span pre-engineered metal building. Work requires demolition of existing structures, installation of ...
New Design/Build Renovation project to an existing two-story building. The existing building had a basement that we gutted and revamped. ...
Construct an owner furnished 3000 square foot metal building for the Otero County Recycling Facility. The project included, site-work, concrete, steel ...
New Pre-Engineeered Metal Building 16,000 Square Foot Heavy Truck Maintenance Shop and two office spaces to include concrete foundations, interior finishes, ...
Structural Improvements to Parkview Elementary in Clovis, NM to include Helical Piers, Concrete, and Windows.
A new 5,000 square foot fire station facility, mixed use occupancy (B and S1), type V-B non-sprinkled construction. The project ...
Tenant Improvement for Regional Finance to include finishes and MEP
A new 27,300 sq. ft. facility with pool and dining areas, locker rooms, and seating for spectators. Built 1978, renovated 1999.
Renovations to Gattis Junior High School to include: Close-in existing windows with stud walls and stucco, New acoustical ceilings and electrcial upgrades, ...
Renovations to Parkview Elementary to include: Close-in existing windows with stud walls and stucco, New acoustical ceilings and electrcial upgrades, ...
Convert an Existing Empty Shell Space into a new Verizon Wireless in Rio Rancho, NM.
The scope of this project involved roofing repairs and replacement of a single-ply TPO roof. Execution required temporary removal of ...
Remodel to the existing Domino's in Roswell, NM. This remodel will upgrade the building to the new prototype.
Rue 21 Build-out in an existing shell in the Wal-Mart Supercenter Parking Lot.
Completly renovate 2 existing buildings to create a new bakery and restaurant for Cornerstone Bakery and Cafe.
Complete renovation to the Quality Inn & Suites located in Ruidoso, NM.
New Taco Bell Restaurant located in Ruidoso, NM built to new prototype standards. News article by Ruido News
Renovations of exterior that will accommodate the New Albuquerque Domino's - Store #9310. Project consists of foundations, asphalt, landscaping, metal ...
The scope of work for this project includes construction of a new 20,000 square foot single story middle school. Construction ...
Crash, Fire, & Rescue Building Modifications
A new two story addition to the jail side and an addition to the courthouse. Renovation in both areas was ...
The Liberty Theater was built in 1923... In 1926 it was renamed the Silco Theater to reflect the economy of the ...
Exteriro Remodel to an existing Arby's Restuarant to meet new Prototype Upgrades
New ground-up 13,225 square foot CVS pharmacy store. Project includes major demolition of existing structures, utilities with boring, building and ...
Remodel an existing Taco Bell into a New Domino's Pizza Theater in Silver City, NM.
Remodel the existing Burger King in Socorro, NM. This remodel will upgrade the building to the new prototype.
The State of New Mexico General Services Department has awarded White Sands Construction a Job Order Contract. This contract has a ...
Remodel the existing Burger King in Trinidad, CO. This remodel will upgrade the building to the new prototype.
White Sands Construction was selected as the Design/Build Contractor for this project. Design is underway and construction is expected to ...
The Tu Casa Continuum of Care Center will offer a full spectrum of culturally sensitive substance abuse interventions, treatment and ...
The scope of this project included interior and exterior renovation of an approximate 5,000 square foot existing stucco-over-wood structure utilized ...
New 98,403 square foot three story indoor storage facility and three additional single story buildings for U-Haul. Projects consists of ...
New 49,743 square foot two story indoor storage facility for U-Haul. Projects consists of : Major Utilities, Site-work, Asphalt, Site & ...
New Monument Sign for Valley Vista Center in Las Cruces, NM. This includes foundations, structural steel, framing/sheathing, and EIFS.
New Open Space Retail center that will accommodateretail spaces. Project consists of foundations, asphalt, landscaping, wood framing, TPO roofing, EIFS, ...
With the improving economy, more business owners and developers are expanding or building new. WDG Architects has developed long-standing relationships ...
This two story consisted of site development, and construction of a new fire station facility. The project consisted of a ...
Remodel and Additions to the existing fire station #3 for the Village of Ruidoso.
Constructed a new music wing addition and replaced the HVAC at Vista Middle School in Las Cruces, NM.
This project involved construction of a new youth center. Elements of work included structural framing, sandwich board exterior walls with ...
Project Included General Demolition, Site excavation & backfill, concrete flatwork and foundations, landscaping, masonry, structural and lightweight steel framing, rough ...
Addition of a new commercial kitchen hood and attendent plumbing and electrical; some framing and wall finishing; some roofing work
New LEED Silver 16,207 square foot steel frame facility to be located in an existing parking lot. This project involved construction ...