Close
Skip to Content
High Contrast
Increase Text Size
Clear All
Testimonials
Apply for Employment
575-437-7816
575-437-7816
Home
About
Awards
Community Outreach
Our Team
Catlin Curry
Zeke Greer
David Malett
David Wootten
Debbie Lucero
Donald Yee
Louann Satathite
Ethan Schulz
Eugene Varbel
John Ballin
John Henderson
Kimber Dennison
Levi Williamson
Louann Satathite
Marc Davis
McChristie Curry
Mike Ford
Norman Drews
Raul Ruiz
Ray Fletcher
Steve Malett
Tyrel Parker
Juan Carreras
Nathan Nowell
Louann Satathite
Careers
Construction Services
Commercial Construction
Construction Management
Foundation Repair
Private Contractor
Projects
JAH4WW Project
Contact Us
Testimonials
Apply for Employment
RedTeam Go Login
575-437-7816
Top
Old Projects Page
Carrizo
Project Info
Carrizo
Carrizo Community Center
Sq Ft: 5,250
Carrizo Community Center Renovations
After originaly building this community center in the 1990's, White Sands has been selected to perform renovations on this complex and bring it back up-to-date complete with: New Roof New Stucco System Patch & Repair and Paint Drywall Surfaces Mechanical and Elecrical Upgrades to lighting and fixtures New Flooring and Cove Base New HM Frames, Doors, & Hardware New Window Blinds and Toilet Partitions Restore Site to Original Condition
Sq Ft: 5,250
Completion Date: 04/14/2014
Carrizozo Community Center - Misc. Renovations
West Door – Remove and Replace Door and Hardware, Prep, Fix and Repaint Frame, Paint New Hollow Metal Door · Water Heater Room – Provide and Install new Hollow Metal Door (Unpainted) and Hardware in existing Hollow Metal Frame, Provide new Wood Slab above Existing Door · Bowling Area – Provide and Install 2 new Hollow Metal Doors (Unpainted) and Hardware in existing Hollow Metal Frame, Provide new Wood Slab above Existing Door · Main Entrance – Remove Existing Double Doors and Sidelights, Provide & Install new 4’x7’ Entrance Door & Frame (Hollow Metal & Painted), Frame, Insulate, Stucco, & Drywall New Wall to accommodate (Drywall will not be painted and Stucco will match as close as possible), No new cove base or flooring · Main Entrance (Bird Loft) – Frame & Stucco New Wall to close off area · North Windows (2) – Remove & Replace Glass, Prep and Repaint Frames · East Windows (2) – Remove & Replace Glass, Prep and Repaint Frames · Interior Wall Partition – Frame new Wall (30’ long) to Acoustic Ceiling to separate future library from other areas, wall to be insulated and drywalled both sides ( No Painting), Provide & Install new Hollow Metal Frame and Wood Door 3’x7’ ( No New cove base or flooring) · Test all sewer, gas, water lines and provide reports
Completion Date: 12/31/2015
Carrizozo Health Center
Sq Ft: 4,500
Completion Date: 12/31/1999