Top
IHOP  Photo
  • Project Info

IHOP

  • Alamogordo IHOP Restaurant
    • New IHOP Restaurant built in 87 Days, which was the fastest ever built in the country! Project consisted of wood framing/trusses, standing seam and single ply roofing, 3-coat stucco with foam pop-outs, awnings, storefronts and glazing, gypsum board, wall coverings, vinyl flooring, carpet, and ceramic tile. The project also consisted of traditional plumbing, HVAC, and electrical. The electrical included fire alarm, control wiring, communications, and data. The kitchen equipment was installed as well as 4 exhaust hoods with ansul systems and 1 condensate hood. The freezer/coolers were built in place after the walls went up.
    • Sq Ft: 4,988
    • Completion Date: 12/15/2010
  • Alamogordo IHOP Restaurant - Repairs
    • Insurance Repairs to include new Finishes including but not limited to Framing, Insulation, Drywall, Storefront, Stucco, & Brick Repairs as Required
    • Sq Ft: 4988
    • Completion Date: 05/20/2019
  • Artesia IHOP Restaurant
    • New IHOP Restaurant. Projects consists of wood framing/trusses, standing seam and TPO roofing, EIFS, awnings, storefronts and glazing, gypsum board, wall coverings, vinyl sheet flooring, carpet, and ceramic tile.
    • The project also consisted of traditional plumbing, HVAC, and electrical. The electrical included fire alarm, control wiring, communications, and data. The kitchen equipment was installed as well as 4 exhaust hoods with ansul systems and 1 condensate hood. The freezer/coolers were built in place after the walls went up. The project also had us demo two old Buildings at the beginning of the project at one of the many busy insersections in Artesia, NM For more information click the links below. Saying goodbye to a local landmark Bullock'scomes down
    • Sq Ft: 4010
    • Completion Date: 08/02/2013
  • Las Cruces IHOP Remodel & Prototype Upgrades
    • Remove & Replace existing roof to include all roof-top equuipment. Remove & Replace restaurant tile, bathroom partitions, and kitchen ceilings. Re-paint exterior and interior to meet new prototype colors. Provide new landscaping and new sidewalk.
    • Sq Ft: 6379
    • Completion Date: 05/18/2012
  • Mount Vernon, Washington IHOP Restaurant
    • New IHOP Restaurant. Project consisted of wood framing/trusses, standing seam and single ply roofing, 3-coat stucco with foam pop-outs, awnings, storefronts and glazing, gypsum board, wall coverings, vinyl flooring, carpet, and ceramic tile. The project also consisted of traditional plumbing, HVAC, and electrical. The electrical included fire alarm, control wiring, communications, and data. The kitchen equipment was installed as well as 4 exhaust hoods with ansul systems and 1 condensate hood. The freezer/coolers were built in place after the walls went up.
    • Sq Ft: 4856
    • Completion Date: 12/14/2012