Close
Skip to Content
High Contrast
Increase Text Size
Clear All
575-437-7816
575-437-7816
Home
About
Awards
Community Outreach
Our Team
Chevy Teague
Catlin Curry
Zeke Greer
David Malett
David Wootten
Debbie Lucero
Donald Yee
Ethan Schulz
Eugene Varbel
John Ballin
John Henderson
Joyce Tilbury
Kimber Parsons
Levi Williamson
Marc Davis
McChristie Curry
Mike Ford
Mike Watters
Norman Drews
Raul Ruiz
Ray Fletcher
Robert Amos
Steve Malett
Construction Services
Commercial Construction
Construction Management
Foundation Repair
Private Contractor
Testimonials
Reviews
Contact Us
575-437-7816
Top
Projects
Community Churches
Project Info
Community Churches
Christ Community Church - Kid’s Ministry Expansion
New 3452 square foot addition for the new Kids Ministry.
Sq Ft: 3452
Completion Date: 11/13/2018
Christ Community Church - Office Additions & Breakroom Remodel
New 1200 square foot addition for new offices and a 560 square foot breakroom remodel.
Sq Ft: 1760
Completion Date: 05/10/2017
Community United Methodist Church - Warehouse Youth Center
This project involved construction of a new youth center. Elements of work included structural framing, sandwich board exterior walls with stucco finish, metal roof over wood trusses and interior finishes including gypsum wallboard systems, vinyl composition tile and clear span ceilings. Room types included conference rooms, meeting rooms, offices, kitchen, restrooms and specialty rooms.
Sq Ft: 6,500
Completion Date: 11/29/2007
Corinth Baptist Church Classroom Building
The scope of this project involved design and construction of a 45’ x 100’ pre-engineered metal building to be used as a classroom building. White Sands Construction was responsible for site preparation and site utilities including water, sewer, electricity, gas and communications. The metal building was erected on a concrete slab and required structural framing of the exterior walls and roof structure. Exterior doors, windows and metal wall and roof panels were installed. The inside of the exterior walls were furred out using metal studs with bat insulation being placed between the studs and surfaced with sheetrock. Interior walls were also created using metal studs faced on both sides with gypsum wall board creating an office, eleven classrooms, restrooms and other common areas. Ceilings were constructed using metal grids with acoustical ceiling tiles. Metal doors with glass viewers were used in all area except for restrooms. Flooring types included vinyl composition tile and ceramic tile. Building systems included water, waste water, communications and electrical. Exterior work included site improvements including sidewalks and landscaping using native plantings.
Sq Ft: 4,500
Completion Date: 05/30/2008