Close
Skip to Content
High Contrast
Increase Text Size
Clear All
Testimonials
Apply for Employment
575-437-7816
575-437-7816
Home
About
Awards
Community Outreach
Our Team
Catlin Curry
Zeke Greer
David Malett
Carleigh Carroll
David Wootten
Debbie McGee-Lucero
Donald Yee
Ethan Schulz
Jason Patterson
John Ballin
John Henderson
Juan Carreras
Kimber Dennison
Levi Williamson
Louann Satathite
Marc Davis
McChristie Curry
Mike Ford
Nathan Nowell
Norman Drews
Raul Ruiz
Ray Fletcher
Steve Malett
Tyrel Parker
Jeep
Chrysler
Dutch Bros
Scooter’s Coffee
Twisted Sugar
Sam's Smoke Shop
Everest Cannabis Co.
Ross Dress for Less
Famous Footwear
World Peace Smoke Shop
Cellular Sales
Baskin-Robbins
First Savings Bank
Miller Waldrop Furniture
Regional Management Corp
TitleMax
Ultra Health
Vireo Health
WaFd Bank
Zia Natural Gas Company
Artesia Family Health Center
White Sands Missile Range
Big Bend National Park
El Camino Real International Heritage Center
New Mexico Department of Cultural Affairs
Village of Ruidoso Fire
Lincoln County
Otero County
United States Department of Veterans Affairs
Design-Build FY12 F-16 ATF/SEAD Training Facilities
Dona Ana County MVRDA 911 Center
New Mexico Farm and Ranch Heritage Museum
Alamogordo Readiness Center Addition/Alteration
Christ Community Church
Sacramento Mountain Senior Services
Encompass Health
MountainView Urgent Care
Three Crosses Regional Hospital
Village of Ruidoso Tom W. Jones Memorial Station
Carlsbad Fire Station #6 - Addition & Remodel
Town of Carrizozo Fire
La Mesa Volunteer Fire Station
Artesia Cottonwood Fire Station
New Mexico State University - Carlsbad
Alamogordo Public Schools
Las Cruces Public Schools
Hagerman Municipal Schools
Santa Fe Public Schools
Hobbs Municipal Schools
New Mexico School for the Blind and Visually Impaired
Alamogordo Supercenter Retail Building
Brazito Plaza Space Improvements
Carlsbad Pavilion Retail Center Tenant Improvements (West Pierce)
Carlsbad Retail Center Shell Building (South Canal Street)
Deming Retail Center Shell Building (North Main Street)
New Mexico State University - Alamogordo
New Mexico Institute of Mining and Technology
New Mexico General Services Department
Truth or Consequences Municipal Schools
New Mexico Museum of Space History
Children In Need of Services
Mountain View Dental & Orthodontics
St. Francis Newman Catholic Church
Dona Ana County
Gerald Champion Regional Medical Center
City of Alamogordo
Village of Ruidoso
Las Cruces Convex Concepts Retail Buildings
Encanto Dental Group
Chevrolet
Melrose
Famous Footwear
Maurice's
American Family Entertainment Centers
Baja Broadband
Corona Public Schools
New Mexico Highlands
HSC
Ruidoso Downs
WIC
City of Carlsbad
Eddy County
Cibola County
City of Roswell
Jersey Mikes
Royal Crossing
Region 9
Fort Stanton
Hubbard Museum
Sunnyside UP
High Rolls Volunteer Fire & EMS Department
Dungan Volunteer Fire & EMS Department
City of Artesia
Town of Mesilla
Department of Military Affairs
Schlotzskys
Casa Auto Group
City of Las Cruces
PNC
Ruidoso - 603 Mechem Housing Development
Ruidoso - 1114 Mechem Housing Development
El Lumbre Farms
Roosevelt County
First Baptist Church Cloudcroft
MATI
Dona Ana County
New Mexico State Police
Luna County
Advanced Hearing Care
Plaza Street Partners
WSCI Development
Durban Development
Accelerated Development Services
Cottonwood Christian Fellowship
Tularosa Fire Department
Louann Satathite
Simons Real Estate Group
White Sands Mall
Behavior Learning Center
NM Behavior
Hobbs NMJC
Long John Silvers
Comet Cleaners
Jason Patterson
Mathew Baranowsky
Careers
Construction Services
Commercial Construction
Construction Management
Foundation Repair
Private Contractor
Projects
JAH4WW Project
Contact Us
Testimonials
Apply for Employment
RedTeam Go Login
575-437-7816
Top
Old Projects Page
Otero County
Project Info
Otero County
Otero County Courthouse - Misc. Renovations
Misc. Renovations to the Existing Otero County Courthouse
Completion Date: 06/30/2020
Otero County Courthouse 2nd Floor Restroom Modifications
Renovating the second floor courthouse restrooms including new fixtures, plumbing, tile and lighting.
Sq Ft: 250
Completion Date: 12/30/2011
Otero County Courthouse Misc. Work
Misc. Work at Otero County: Convert open area to new Judges Chambers Remodel Existing Small Hearing Room Add Misc. Ductwork Remodel Managers Office Replace Shelving
Completion Date: 01/30/2015
Otero County Courthouse Remodel
The objective of this project was to remodel the first level of the exist jail to create 9,000 s.f. of new offices for the District Attorney. Execution of the work required demolition of the existing space to the structural elements. The new configuration houses private offices, conference rooms, waiting areas and open space for systems furniture. The existing structural columns within the area remained in place and were faced with gypsum wall board. Similarly, new walls were constructed using metal studs faced with sheet rock on one or both sides. Walls and structural columns in the common areas received wainscot on the lower portion and were trimmed with wood veneer strips. A conference room was constructed within the space using similar finishes. Semi-private work spaces were constructed by providing walls the same height as the wainscoting on the perimeter walls and were finished with wainscot with wood and wood veneer trim. Other finishes in these areas included surface mounted acoustical ceiling tiles and light fixtures. Carpeting was used throughout the private and public areas. A kitchen/break room was also created using a gypsum wallboard system, acoustical ceiling and vinyl composition tile flooring. Other work in the kitchen required installation of a sink, cabinets and countertops and required plumbing, ventilation and electrical features Separate men’s and women’s ADA compliant restrooms were constructed using hard surface walls and ceramic tile floors with toilet partitions and plumbing fixtures. Access to the offices was provided from the exterior through a newly created storefront entrance. This required demolition of an existing sally port that provided controlled access from the jail to the parking lot. ADA ramps were also provided. Repairs at the new opening also included stucco repairs and masonry infill. Building systems included: a boiler and chiller for the HVAC system, plumbing, communications and electrical.
Sq Ft: 9,360
Completion Date: 09/08/2009
Otero County Detention Center Additions and Repairs
The construction of approximately 36,000 SF of additions and the renovation of approximately 10,000 SF of space at the existing Otero County Detention Center and other Work indicated in the Contract Documents. The additions will be constructed primarily of concrete masonry units (CMU) and precast concrete roof members. Project Includes the construction of additions to the Booking Area, Administration Area, Laundry, and Recreation Yards north of the existing housing unit, and construction of a new Mechanical/Electrical Building plus related site work. The renovation of the existing Booking Area, Administration Area, Laundry, and associated spaces. The replacement of all interior lighting fixtures, main plumbing lines, and security systems. The construction of additions to the Medical Area, Kitchen, and Receiving Area. The renovation of the existing Medical Area and Kitchen. Perimeter security fencing and gates are also included in the Project
Sq Ft: 46,000
Otero County Dispatch Center
Renovation and Interior Build-out to an existing Pre-Engineered Metal Building for the new 911 Call Center in Otero County. Project included light gauge framing, sound board, drywall, insulation, painting, stucco, carpet, ceramic tile, electrical, HVAC, and Plumbing.
Sq Ft: 2,000
Completion Date: 01/20/2011
Otero County Fairgrounds New Exhibit Building
This project involved construction of new 19,200 s.f. clear-span pre-engineered metal building. Work requires demolition of existing structures, installation of a concrete foundation with helical piers. The building houses exhibit areas, a kitchen and restrooms. The project required a new water main extension, mechanical, electrical and plumbing service and systems.
Sq Ft: 19,200
Completion Date: 07/30/2009
Otero County La Luz Transfer Station Facility - Phase 2
This project consists of upgrades to an existing solid waste convenience center operated by Otero County in the community of La Luz which includes the construction of the La Luz Landfill Transfer Station building, required utility work such as but not limited to mechanical and electrical components for proposed building, construction of a new access road and drive pad that ties into existing access roads, retaining wall and other associated appurtenances and general site work. Work of the Project includes construction of a new Transfer Station, including a public vehicle drive-in bay, office and storage space, and a lower trash truck pull-through bay for hauling solid waste.
Sq Ft: 5600
Completion Date: 01/18/2019
Otero County La Luz Transfer Station Facility - Tenant Improvement
Interior Tenant Improvement to teh Trasfer Station We Built in 2018. Project Includes Framing, Insulation, Windoes/Doors, Drywall, Cove Base, FRP, Toilet Accessories, and MEP.
Sq Ft: 936
Completion Date: 12/04/2019
Otero County Office Complex
New Design/Build Renovation project to an existing two-story building. The existing building had a basement that we gutted and revamped. The project included a new elevator, stucco, cultured stone, light gauge framing, remove/replace roofing, drywall, painting, plumbing, HVAC, and Electrical.
Sq Ft: 11,928
Completion Date: 05/28/2010
Otero County Recycling Hub Facility
Construct an owner-furnished 3000 square foot metal building for the Otero County Recycling Facility. The project included, site-work, concrete, steel erection and electrical.
Sq Ft: 3000
Completion Date: 11/07/2011
Otero County Road Department Maintenance Shop Building
New Pre-Engineeered Metal Building 16,000 Square Foot Heavy Truck Maintenance Shop and two office spaces to include concrete foundations, interior finishes, plumbing, HVAC, and electrical systems.
Sq Ft: 16,000
Completion Date: 09/27/2006
Otero County Zia Therapy Center
Sq Ft: 7,267
Completion Date: 08/22/1997